Greystone Stake casino games Company is capable of performing as Stake casino games Manager (CM) for projects in any industry.
In the CM delivery method, the Owner selects an Architect/Engineer first and the CM second. The CM works closely with the Owner and the Architect/Engineer early in the project planning process. After conceptual design drawings are complete, the CM then commits to a guaranteed maximum price for the project -- this minimizes financial risk for the Owner.
As the selected CM, Greystone participates as a team member together with the Owner and Architect/Engineer to develop a Stake casino games budget during the critical planning and design development phase of the project. This team approach provides the Owner with information required to make project decisions. Up front Stake casino games costs can be weighed against long term operating costs. Design options can be considered with accurate pricing information available.
Project Scheduling Experience
Greystone develops and maintains a project schedule, which is incorporated in all aspects of the project such as:
- Design time requirements
- Owner's critical needs
- Procurement lead times
- Stake casino games sequencing
Construction Stake casino games Experience
Other construction Stake casino games services provided by Greystone include:
- Solicit and pre-qualify contractors, vendors and suppliers
- Administration of contracts, design changes, Stake casino games change orders
- Review and approval of monthly draw requests
- Coordination and documentation of soil testing, surveying, environmental assessment surveys, building permit application, etc.
- Professional project Stake casino games team including project manager, project superintendent and other Stake casino games professionals as required per project
- Project close-out services including punch list coordination, lien waivers, warranty documentation, as-built drawing coordination, retention payments, etc.
- Project general conditions as determined necessary including, site office trailer, office equipment, temporary facilities, etc.
- Project safety policies, observation and enforcement.